32.5MW
Energized capacity online
5
Facilities across the Midwest
160MW
Secured and in development
155+MW
Convertible to Tier III capacity
2
States
32.5 MW online160 MW in development192.5 MW at full build-out
What the name means
Four commitments, in order
Anticipate
the needs of our clients and the shape of tomorrow’s workloads, so capacity is ready before it is urgent.
Adapt
to evolving challenges — power markets, hardware generations, and thermal envelopes that change every cycle.
Integrate
innovative solutions end to end, from substation and switchgear through to the network and the rack.
Manage
every aspect of operations with our own people, so accountability never gets handed to a subcontractor.
Vertical integration
We build what we operate
Every facility is designed and constructed in-house by our own team of engineers and operators. That is unusual in this industry, and it is deliberate: the people who specified the switchgear are the same people who answer when an alarm fires at three in the morning.
The result is faster turnarounds, solutions tailored to the actual workload rather than a generic template, and a single accountable partner across the whole stack — power, cooling, network, and remote hands.
That model lets us support the full range of high-density compute: AI and machine learning clusters, high-performance computing, digital asset mining, and enterprise workloads that have outgrown a traditional colocation cage.


AAIM at a glance
Our journey. Built in the Midwest.
From our founding to continued expansion, we're building the infrastructure that powers the future of compute.
2022
AAIM is founded
Formed by a team with a combined 75 years of experience in data centers and high-performance computing.
2023
First expansion secured
Land purchased in Nebraska to fuel the next phase of growth.
2024
First site online
AAIM energizes its first Missouri facility in October — 10 MW, built on the site of a former clay brick plant.
2024
Nebraska online, Minnesota secured
The first Nebraska facility is energized and land is secured in Minnesota for further expansion.
2024
Minnesota 4 online
Minnesota 4 comes online in October, adding 7.5 MW of colocation capacity.
2025
Minnesota 1 online
Our Blue Earth flagship is energized in June — 15 MW across nearly 10,000 sq ft.
2025
Nebraska 1 divested
AAIM sells its first Nebraska facility in a private sale — 15 MW.
2025
Second Nebraska site breaks ground
Construction begins near Hastings in partnership with Southern Power Public District.
2026
Secure MN2
Minnesota 2 is secured — 20 MW of air-cooled capacity in development for Q4 2026.
2026
Secure MN3
A third Minnesota site is secured — 10 MW of liquid-cooled capacity for Q4 2026.
2026
Energize Nebraska 2
The second Nebraska facility is energized, bringing 12.5 MW of new regional capacity online.
2026
Divest Nebraska 2
Nebraska 2 is divested as a 12.5 MW transaction.
2026
Secure MN1 80 expansion
An 80 MW expansion is secured at Minnesota 1, now in design and targeted for Q3 2027.
What’s next
Where we are heading
Expanding across the Midwest
Growing our presence in Minnesota and neighbouring states, bringing capacity closer to clients and improving regional connectivity.
Tier III data center expansion
Building out Tier III capacity across our sites — concurrently maintainable power and cooling, so a facility can be serviced without taking client load offline. The 80 MW expansion in design at Minnesota 1 is the first of these.
Operations company support
Dedicated logistical support and expert guidance, so operators can focus on productivity rather than infrastructure.
Get in touch
Interested in our data centers?
Tell us what you need to deploy — capacity, timeline, hardware — and we'll come back with a straight answer.